
Riyadh Central Hospital
Clean-room grade HVAC ductwork with HEPA filtration for surgical suites, isolation wards, and laboratories.

Riyadh Central Hospital
This critical healthcare project required clean-room grade HVAC ductwork installation for a major hospital facility. The project included surgical suites, isolation wards, laboratories, and patient rooms, each with specific air quality and contamination control requirements.
Request Similar ProjectLocation
Riyadh, Saudi Arabia
Completed
2024
Area Covered
8,500 sq.m
Team Size
50 technicians
Challenges
Strict clean-room standards and certifications
HEPA filtration integration
Bacterial and viral contamination prevention
Hospital operation continuity during construction
Compliance with healthcare facility regulations
Our Solutions
Clean-room grade ductwork with sealed joints
HEPA filtration systems throughout
Positive and negative pressure management
Phased installation to maintain hospital operations
Comprehensive certification and testing
Project Highlights
Full compliance with ISO 14644 clean-room standards
HEPA filtration removal of 99.97% of particles
Zero contamination incidents post-installation
Hospital operations maintained throughout
Full medical facility certifications obtained
Project Gallery



Ready to Start Your HVAC Project?
Get a free consultation and detailed quotation from our expert team. We are committed to delivering premium duct solutions on time and within budget.